Training Facility - Fire Service

Fire Service Training Facility General Construction
  • Repair all holes in floor and roofs
  • Replace with new expanded metal floor on upper roof.
  • Re-build new hatches
  • Re-build new sliding steel door access.
  • Sand blast entire floors and walls as necessary to repair the surface.
  • Drill in larger holes so that the water can be released better.
  • Repair all railings and stairs as required to make safety.
  • Replace metal at engines and build a steel heat shield to protect container
  • Repaint entire area of shipping containers with a high heat paint good up to 1600 degrees and prime bare new metal with primer.
  • Supply and install four (4) new 90min rated steel doors with welded push/pull entry device.